Low adjusted bid
$1,487,239 Apex Civil — after levelingLevel My Subs presents
SUB ZERO
Bid leveling for builders
Expose exclusions, normalize scope gaps, and find the real low number before buyout.
Founder build: local-first, paste-text workflow, no cloud bid uploads yet.
Open clarifications
8 3 high priorityBid spread
$428,241 After normalization| Bidder | Base | Adjusted | Risk |
|---|---|---|---|
| Apex Civil | $1.39M | $1.49M | Medium |
| Ridgemont Site | $1.91M | $1.92M | Low |
| Beacon Earthworks | $1.22M | $1.66M | High |
Sample data shown for product preview.
Built for project coordinators, assistant PMs, estimators, small GCs, and residential builders who need fast bid leveling without enterprise software pricing.
Paste bid text
Copy proposal text from PDFs, emails, spreadsheets, or quotes and let SUB Zero draft the first pass.
Level the number
Compare raw bids against scope gaps, allowances, alternates, bond, deducts, and GC-carried work.
Print the report
Walk into buyout with adjusted ranking, clarifications, risk flags, and the current recommended target.